Brugg Cables completed first installation in DEWA for ERJ

Pioneer product designed by Brugg Cables to offer solutions towards the challenges that utilities and end users are experiencing from faulty old joints or cable failures.

After Transco Abu Dhabi, the ERJ Joint is now installed in DEWA Dubai to replace few old faulty joints.
The existing circuits are put on outage and the Brugg team is engaged to dismantle the old joints and install the ERJ.

The client is now enjoying this product as it brings reliability to networks and save up to 60% from both cost and time comparing to classical repair methods.

Thank you, DEWA, for your trust and the support to develop this unique product.