The existing overhead lines have been replaced by an underground cable line. 114 km of high-voltage cable and 100 km of medium-voltage cable have been laid. This corresponds to the distance from Zernez to Genoa.
We would like to thank all those involved - EKW AG, Axpo Grid AG, Calanda Logistik AG, ERAG Netzbau AG, IED Gruppe AG, Arnold AG, and of course Brugg Cables.
The longest high-voltage power line ever built in Switzerland goes into operation - find out more in the video.